Midas Technologies Welcome to Midas Technologies
Midas Portal Midas - About Us Midas - Projects Midas - Services Midas - Contact Us Midas - FAQs Midas - Site Index Midas - Clients Area Midas - Links  
over text
 
 
  Sky Venture Sky Diving Facility - Milton Keynes
 

Value | £250k

Client | Sky Venture UK

Main Contractor |
Buckingham Group

Architect | Burksgreen

Scope | Design, make and install mesh cladding

Design, manufacture and installation of feature stainless steel mesh cladding and stainless doors. From initial concept by the Architects Midas worked as part of the project team with the client to provide a secure feature enclosure to the Sky Diving simulator building.

This is the first free fall sky diving simulation facility of its kind in the UK, originating from Disney World, Florida. Called AIRKIX in the UK, it is a state-of-the-art skydiving vertical wind tunnel designed for the general public and for professionals to train. Visitors are completely immersed in the world of high adventure skydiving with air speeds of up to 160mph, without ever having to pack a parachute.

Construction took place over 12 weeks with the wind tunnel motors and plenums were fitted during steel erection. The structure looks stunning when illuminated at night and can be seen for miles over the sky line of Central MK.



Downloads

Skyventure-PDF
To download the PDF version of this page, right click here

Back to Projects Back to Projects


Bookmark and Share
 
  Enterprise Europe Network WTL CHAS CSCS BSSA
  Midas Technologies (GB) Ltd Midas House, Roundhouse Close, Eastern Industry, Peterborough, PE1 5TA Telephone: +44 (0)1733 342600 Facsimile:+44 (0)1733 346672 Email: sales@midastech.co.uk
2010 © Design & Copyright. All Rights Reserved Midas Technologies. Site Powered by esc.creative